You can see some of the projects carried out by Qeshm Voltage Company in the table below.
| Employer Name | Subject | Year of Project Completion |
|---|---|---|
| Khuzestan Steel Company (KSC) | Installation and commissioning of the control system - Design - Manufacturing of a POSITIONER, and supply of VALVE POSITIONER equipment | 2011 (1390) |
| Yazd Alloy Steel Company | Control system panel - Design - Manufacturing - Programming - Installation and commissioning of Water Cooling control via the Redundant Siemens control system (S7-400H) | 2010 (1389) |
| Poolad Ark Company (Ark Steel Company | Design - Wiring - Installation - Commissioning and programming of the control system for the Khuzestan Steel pelletizing plant | 2010 (1389) |
Project Images